All
costs are estimates in USD and are subject to changes.
SLC Average Program Costs
- All SLC Administrative and Overhead costs have been funded by a generous donor, thus 100% of your donation is applied directly towards Program Costs.
- Building one School costs approx. $25,000.
- Building a New Home costs approx. $5,000.
- Rehabilitating a Home costs approx. $1,000.
- Providing Tools and Equipment approx. $100-$500.
Housing Project:
- Building new unit: $5,000
The new units will be:
- Minimum 500 square feet
- Homes consist of two bedrooms, living room, kitchen and indoor plumbing
- Services:
- Electrical-each room will have one power point and one light point
- Water
- Drainage
- Materials:
- Foundation
- Roof-designed to ensure cross ventilation. Materials will be clay tiles
- Walls-cement hollow blocks. Exterior and interior will be plastered
- Floor-cement rendered
- Doors and windows-wood
House Schematic -Elevation
House Schematic -Floor Plan
House Schematic - Front Elevation
House Schematic - Foundation Details
|